Binghatti Sky Terraces in Motor City was the best-selling off-plan apartment project in Dubai in both September and October 2026. 1 beds start at about Dh1.166M, 2 beds at about Dh1.89M and 3 beds at about Dh2.925M, on a 20/50/30 plan, with the Dubai Land Department (DLD) record showing completion in October 2027.
My October 2026 market report counted 208 units registered here in October and 252 in September. The site had no page on it until now. The building, its amenities and its structure are from Binghatti's official brochure and floor plans; prices, the payment plan and registry status are as listed on Reelly. Where a number is my own calculation, I say so.

Binghatti Sky Terraces at a glance
- Developer: Binghatti, founded in 2008 with more than 50 projects delivered, per the brochure.
- Location: Motor City, next to JVC and close to Sheikh Mohammed bin Zayed Road.
- Building: two basements, ground, six parking levels and 40 residential floors per the floor plans; 1,886 units in the DLD record.
- Homes: studios, 1, 2 and 3 beds, all with deep terraces.
- Today's prices on Reelly: 1 bed from Dh1,165,929, 2 bed from Dh1,889,999, 3 bed from Dh2,924,999.
- Payment plan: 20% on booking, 50% during construction, 30% on handover.
- Handover: 31 October 2027 per the DLD record; 31 December 2027 per Reelly.
- Service charge: Dh12 to Dh18 per sq ft, per Reelly.
- Furnishing: kitchen appliances included.
- Tenure: freehold for all nationalities, 4% DLD fee.
Binghatti Sky Terraces price list and price per sq ft

| Home | Typical size | From | Per sq ft |
|---|---|---|---|
| Studio | 311 to 508 sq ft | about Dh775K | ~Dh2,150 |
| 1 bed | 700 to 860 sq ft | Dh1,165,929 | Dh1,630 to Dh1,810 |
| 2 bed | 1,055 to 1,280 sq ft | Dh1,889,999 | Dh1,700 to Dh1,790 |
| 3 bed | 2,521 to 2,725 sq ft | Dh2,924,999 | Dh1,084 to Dh1,160 |
These figures come from the unit list on Reelly, and the price per foot is my calculation. Studios appear among the layouts but not in today's availability, so they have likely sold. The 3 beds are much cheaper per foot, probably because their stated size includes the large terraces. Ask for the internal area before you compare.
For context, my October report put Dubai off-plan apartments at Dh1,719 a foot, and the 1 and 2 beds here sit right around that. The median registered value here rose from about Dh840,000 in September to Dh1.1M in October, which says more about larger units selling than about a price rise.
The building, the terraces and the amenities

Per the brochure, the wave-shaped facade is designed to create deep, staggered terraces on every floor, so every home has usable outdoor space. Listed finishes include marble, travertine, European walnut and bronze metal, and homes come with smart home systems. The amenities:
- An adult pool and a shallow pool.
- A kids' pool and water splash games.
- A kids' play area and a family seating zone.
- A padel court.
- Green terraces.
- An indoor gym, a jogging track and a yoga area.
Binghatti Sky Terraces payment plan: 20/50/30
Per Reelly, 20% is due on booking, 50% during construction and 30% on handover. The dates of the construction 50% are not listed. The amounts are my calculation for the Dh1,165,929 1 bed:
| Step | Share | Amount |
|---|---|---|
| On booking | 20% | Dh233,186 |
| DLD fee | 4% | Dh46,637 |
| During construction | 50% | Dh582,964 |
| On handover | 30% | Dh349,779 |
So Dh279,823 on booking day with the DLD fee, and an all-in cost of Dh1,212,566. The catch for a buyer today is that handover is only 11 to 13 months away. The construction 50% is squeezed into a short window, and any instalments whose dates have already passed may be due at once on the day you buy. Get the exact schedule from Binghatti and see what you would actually pay in month one.
Handover date and current stage
The DLD record shows an expected completion of 31 October 2027, about 11 months from today, and Reelly lists the end of construction as 31 December 2027. As listed on Reelly on 18 November 2026:
- Sale status: on sale.
- Construction status: under construction, with a registered start date of 1 January 2026.
- DLD registration: active, project number 4327, registered 29 January 2026.
- Escrow: Dubai Islamic Bank.
- Completion: the only inspection on Reelly is dated 7 January 2026, at 0%.
That zero is ten months old and does not reflect progress today. Enter the project number in the DLD project status page to see the current figure, which matters with a handover less than a year away.
Location: Motor City distances

Motor City sits next to JVC and Sports City, with access to Sheikh Mohammed bin Zayed Road and Al Khail Road. The brochure map shows only broad drive-time rings, so I worked out straight-line distances from the tower's coordinates. The drive is longer:
| Destination | Straight-line distance |
|---|---|
| JVC | ~2 km |
| Dubai Hills Mall | ~6 km |
| Mall of the Emirates | ~8 km |
| Global Village | ~8 km |
| Dubai Marina | ~10 km |
| Expo City | ~12 km |
| Downtown Dubai | ~17 km |
| Dubai International Airport | ~27 km |
Service charge and the rent each yield needs
Reelly lists Dh12 to Dh18 per sq ft, which on a 715 sq ft 1 bed is about Dh8,580 to Dh12,870 a year. Ask for the exact figure for your unit.
For the Dh1,165,929 1 bed with the 4% DLD fee, a 6% gross yield needs about Dh72,754 a year and 7% about Dh84,880. Before you buy to let, check today's 1 bed rents in Motor City and JVC, and test your own numbers in the net yield calculator.
What the numbers say
The 1 and 2 beds price close to the Dubai off-plan apartment average with a handover that is close, a combination that is rare in today's market. The plan is heavier than it looks for a buyer today, because 70% of the price is paid within about a year. And the tower is large: 1,886 units handing over at roughly the same time, so first-year rents will be competitive.
Who Binghatti Sky Terraces suits
It suits someone who wants an apartment with a near handover in an established area and has the cash to pay 70% within a year. The 3 beds, from about Dh2.9M, clear the Dh2M threshold for the 10 year golden visa, and the larger 2 beds come close; the rules are in my golden visa guide. I have also covered Binghatti's Starfall.
What I would check before booking
- The exact schedule of the construction 50%, and what you would actually pay in month one.
- The current construction progress on the DLD.
- The handover date and delay clause in the SPA.
- The internal and terrace area of your unit, especially for the 3 beds.
- The exact service charge for your unit, since Dh12 to Dh18 is a wide range.
- How much must be paid before a resale is allowed.
My take
Binghatti Sky Terraces offers apartments with large terraces at around the city average price per foot and a handover listed for about a year from now, and it is registered with the DLD. Against that, a buyer today pays most of the price in a short window, and the size of the tower will push up rental competition in year one.
If you are buying to let, I think the lowest-priced 1 bed is the best entry. If you are buying to live in, judge the 3 beds on their internal area.
If you want to see what is available, or go through the payment schedule together, message me.
Sources: Binghatti's official brochure and floor plans for Binghatti Sky Terraces; prices, payment plan, service charge, DLD registration and sale status as listed on Reelly, 18 November 2026; my September and October 2026 market reports, built on DLD data.
Frequently asked questions
A residential tower by Binghatti in Motor City, next to JVC, with two basements, ground, six parking levels and 40 residential floors. The DLD record lists 1,886 units, all with deep terraces.
Per the unit list on Reelly: 1 beds from Dh1,165,929, 2 beds from Dh1,889,999 and 3 beds from Dh2,924,999. Studio layouts are listed at about Dh775K but are not in today's availability.
About Dh1,630 to Dh1,810 for 1 beds, Dh1,700 to Dh1,790 for 2 beds and Dh1,084 to Dh1,160 for 3 beds, whose stated sizes likely include large terraces. The DLD based Dubai off-plan apartment average in October 2026 was Dh1,719.
20% on booking, 50% during construction and 30% on handover, per Reelly. On a Dh1,165,929 1 bed that is Dh279,823 on booking day with the DLD fee and Dh349,779 at handover.
The DLD record shows an expected completion date of 31 October 2027; Reelly lists 31 December 2027. The binding date is the one in your SPA.
My DLD based reports counted 252 units in September 2026 and 208 in October, the most of any off-plan apartment project in both months.
Yes. As listed on Reelly on 18 November 2026, it is DLD project 4327, active, registered 29 January 2026, with escrow at Dubai Islamic Bank. The only progress figure on Reelly dates from January 2026, so check the current one on the DLD.
An adult pool and shallow pool, a kids' pool with splash games, a kids' play area, a family seating zone, a padel court, green terraces, an indoor gym, a jogging track and a yoga area.
Reelly lists Dh12 to Dh18 per sq ft, about Dh8,580 to Dh12,870 a year on a 715 sq ft 1 bed. Ask Binghatti for the exact figure for your unit.
With the 4% DLD fee, the Dh1,165,929 1 bed needs about Dh72,754 a year for a 6% gross yield and Dh84,880 for 7%.
By my straight-line calculation from the tower's coordinates: about 2 km to JVC, 6 km to Dubai Hills Mall, 10 km to Dubai Marina and 17 km to Downtown Dubai. Driving distances are longer.